Example 1. A can do a job in 12 days. A and B together do it in 8 days. How long does B alone take?
- xy/(y - x) = 8 x 12/(12 - 8) = 24 days. (LCM method: with a total of 24, A does 2 and the pair does 3 a day, so B does 1 a day.)
Example 2. A and B can finish a job in 12 days, B and C in 15 days, and C and A in 20 days. How long will A, B and C take together?
-
1/12 + 1/15 + 1/20 = (5 + 4 + 3)/60 = 12/60 = 1/5. This is twice the combined rate of the three.
-
A + B + C do 1/10 per day, so they take 10 days.
Example 3. A takes 10 days and B takes 15 days. They start together, but B leaves after 3 days. How long does A take to finish the rest?
-
Together they do 1/10 + 1/15 = 1/6 per day, so in 3 days they finish 1/2.
-
The remaining 1/2 takes A alone 5 days. Total time is 3 + 5 = 8 days, and A works 5 more days.
Example 4 (alternate days). A takes 10 days and B takes 15 days, working on alternate days and starting with A. How long does the job take?
-
In every two days they finish 1/10 + 1/15 = 1/6.
-
Six such pairs finish exactly 1 job, so it takes 12 days.
Example 5 (wages). A takes 10 days and B takes 15 days, and together they earn 5000. How should it be split?
- Efficiency ratio = 3 : 2. A gets 3000 and B gets 2000.
Example 6 (pipes). Pipe A fills a tank in 12 hours, pipe B in 18 hours, and pipe C empties it in 36 hours. All are opened together. When is the tank full?
- Net rate = 1/12 + 1/18 - 1/36 = (3 + 2 - 1)/36 = 4/36 = 1/9. The tank fills in 9 hours.
Example 7 (men-days). 10 men finish a job in 12 days. How many men are needed to finish it in 8 days?
- Men x days is constant: 10 x 12/8 = 15 men.
Example 8 (efficiency). A is twice as good a worker as B, and together they finish a job in 12 days. How long does B alone take?
- Let B take x days, so A takes x/2. Then 1/x + 2/x = 3/x = 1/12, so x = 36. B takes 36 days and A takes 18 days.